JOB RECORD
Field workspace
Check the grade.
All readings in feet. Positive difference means cut; negative means fill.
Ready for a shot.
Enter your benchmark and rod readings to calculate the point elevation.
Recorded observations
| Point | Elevation | Target | Action | Note |
|---|
Know the quantity.
Rectangular excavation or trench estimate. Adjust factors to your actual material and equipment.
Dimensions to a plan.
See bank volume, loose volume, estimated tons, and volume-based truck loads.
Build the road section.
Enter the ground you measured, then choose a road template or your own design points. See the section, check cut and fill, and make a scaled chart sheet.
Ready for a station.
Enter both profiles to get cut and fill areas and a drawn section.
Make a chart sheet
Calculate a section above, or choose a saved station. The screen preview fits your display; the printed sheet uses the selected scale.
Photograph the logo straight-on and crop it in your Photos app first. It will be resized proportionally and saved with this job.
Saved sections
| Station | Cut | Fill | Width | From previous |
|---|
A record worth keeping.
Review your recorded readings and saved quantity estimate before exporting.
Adds a separate planning allowance to section volumes. Measured cut/fill stays unchanged; swell and compaction are separate assumptions.